Scheduling repetitive construction processes using a swarm algorithm
Date
Authors
Type
könyvfejezet
Language
en
Publisher
Budapest University of Technology and Economics
Reading access rights:
Open access
Rights Holder
Szerző
Conference Date
2023.06.20.-2023.06.23.
Conference Place
Keszthely, Hungary
Conference Title
Creative Construction Conference 2023
ISBN, e-ISBN
978-615-5270-79-6
Container Title
Proceedings of the Creative Construction Conference 2023
Department
Építéstechnológia és Menedzsment Tanszék
Version
Online
Faculty
Faculty of Architecture
First Page
454
Note
Creative Scheduling in Construction
Subject Area
Műszaki tudományok
Subject Field
Műszaki tudományok - építészmérnöki tudományok
Subject (OSZKAR)
construction project management
construction scheduling
metaheuristic algorithm
particle swarm optimization
repetitive project scheduling
construction scheduling
metaheuristic algorithm
particle swarm optimization
repetitive project scheduling
Gender
Konferenciacikk
University
Budapest University of Technology and Economics
- Cite this item
- https://doi.org/10.3311/CCC2023-060
OOC works
Abstract
This article presents a method for multi-criteria optimization of repetitive construction processes schedules. Considering the limitations in planning the realization of such projects using classical tools and methods, the use of swarm algorithm for finding non-dominated solutions to the problem was proposed. An example of the application of the particle swarm optimization algorithm to the development of a schedule for the repetitive construction processes realization and the selection of work crews in order to minimize the realization time of the project and downtime in the work crews was also presented.