The behaviour of influence lines of schedule networks with maximal relationships
Date
Authors
Type
könyvfejezet
Language
en
Publisher
Budapest University of Technology and Economics
Reading access rights:
Open access
Rights Holder
Szerző
Conference Date
2023.06.20.-2023.06.23.
Conference Place
Keszthely, Hungary
Conference Title
Creative Construction Conference 2023
ISBN, e-ISBN
978-615-5270-79-6
Container Title
Proceedings of the Creative Construction Conference 2023
Department
Építéstechnológia és Menedzsment Tanszék
Version
Online
Faculty
Faculty of Architecture
First Page
472
Note
Creative Scheduling in Construction
Subject Area
Műszaki tudományok
Subject Field
Műszaki tudományok - építészmérnöki tudományok
Subject (OSZKAR)
CPM
Precedence Diagramming Method (PDM)
Influence lines
Precedence Diagramming Method (PDM)
Influence lines
Gender
Konferenciacikk
University
Budapest University of Technology and Economics
- Cite this item
- https://doi.org/10.3311/CCC2023-062
OOC works
Abstract
The internal rules of influence lines, which show the transitions of activities’ criticality types, were previously investigated in case of PDM networks, where the four minimal end-point relationships or point-to-point relations were allowed. This paper examines the effects of the introduction of maximal relationships on the criticality types and their behaviour. The research contributes to a better understanding of influence lines and the effects of changing an activity’s duration on the project duration.