Műegyetemi Digitális Archivum
    • magyar
    • English
  • English 
    • magyar
    • English
  • Login
View Item 
  •   DSpace Home
  • 1. Tudományos közlemények, publikációk
  • Konferenciák gyűjteményei
  • Creative Construction Conference
  • Creative Construction e-Conference 2022
  • View Item
  •   DSpace Home
  • 1. Tudományos közlemények, publikációk
  • Konferenciák gyűjteményei
  • Creative Construction Conference
  • Creative Construction e-Conference 2022
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Seismic Risk Mitigation and Management for Critical Infrastructures using an RMIR Indicator

Thumbnail
View/Open
CCC2022_044.pdf (951.0Kb)
Metadata
Show full item record
Link to refer to this document:
10.3311/CCC2022-044
Collections
  • Creative Construction e-Conference 2022 [49]
Abstract
Recent earthquake events have highlighted the importance of critical infrastructures (CI) resilience, as a strong correlation was found between the economic loss and the severity of CIs damage. CIs are characterized by a complex structure composed of sub-components that are essential for the continuous performance of the system. CIs owners and governments allocate ample of their resources in retrofitting and upgrading CIs systems and components to increase the resilience of CIs and reduce the risk they are exposed to in case of seismic events. Governments and decision-makers must manage and optimize the retrofit efforts to meet the budget and time constraints. This research presents a probabilistic methodology for seismic risk mitigation and management in CIs. The risk expectancy is appraised according to an FTA-based simulation. The simulation includes the development of exclusive fragility curves for the CI and an examination of the expected damage distribution as a function of the earthquake intensity. Furthermore, this research proposes a novel RMIR (Risk Mitigation to Investment Ratio) indicator for priority setting of seismic mitigation alternatives. The RMIR is a quantitative indicator that evaluates each alternative's cost-effectiveness in terms of risk expectancy mitigation. Following the alternative's RMIR value, it is possible to prioritize the alternatives meeting the budget and time constraints. This paper presents the implementation of the proposed methodology through a case study of a generic pumping station. The case study includes twelve mitigation alternatives examined and evaluated according to the RMIR indicator.
Title
Seismic Risk Mitigation and Management for Critical Infrastructures using an RMIR Indicator
Author
Urlainis, Alon
Shohet, Igal M.
Date of issue
2022
Access level
Open access
Copyright owner
Szerző
Conference title
Creative Construction e-Conference 2022
Conference place
Online
Conference date
9-11 July 2022
Language
en
Page
344 - 355
Subject
Critical infrastructures, Earthquake, Risk Mitigation, Risk management
Version
Post print
Identifiers
DOI: 10.3311/CCC2022-044
Title of the container document
Proceedings of the Creative Construction e-Conference 2022
ISBN, e-ISBN
978-615-5270-75-8
Document type
könyvfejezet
Document genre
Konferenciacikk
University
Budapest University of Technology and Economics
Faculty
Faculty of Architecture
Department
Építéstechnológia és Menedzsment Tanszék

Content by
Theme by 
Atmire NV
DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback

Content by
DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister

Content by
Theme by 
Atmire NV
DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback

Content by
DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV